TBD
St. Charles, MO
NAVIGATE managed pre-construction and construction of this Great Rivers Greenway project to connect two existing trailheads via bridges—218 feet tall and 270 feet tall—across Highways 364 and94. Project scope included:
· Manage LPA Program Process (Federal GrantCompliance Management)
· Signalized Pedestrian Crosswalk
· ADA Trailheads
· Major Excavation, Grading & Retaining Walls
· MODOT Right of Way Work
· Landscaping, Fencing, Signage & GRG Branding
TBD
St. Louis, MO
NAVIGATE is managing the preconstruction and construction of improvements to Maline Greenway. Project scope includes:
· 1.3-Mile New Trail
· 2 Pedestrian Bridges
· 2,000-feet Elevated Precast Concrete Boardwalk
· Creek Slope & Bed Stabilization
· Overhead Trail Protection Structure
· Parking Lot & Trailhead Construction
· Elevated Speed Table Crossing
· Roadway Improvements & Signalized Intersection at Ferguson Avenue
· Interpretive Signage
TBD
St. Louis, MO
NAVIGATE managed pre-construction and construction of improvements to Cliff Cave County Park. Project scope included:
· Park Lot & Trailhead
· 170-Foot-High River Bluff Overlook
· 70-Foot-Long Cliff Cave Road Pedestrian Overpass
· Street Enhancements & Signalized Intersection at Telegraph Road
· Creek Bed Stabilization & Restoration
· Comfort Stations
· 210-Foot-Long, 45-Foot-Tall Ravine Crossing
· Low Land Restoration
· Natural Bat Habitat Protection
· 2.5-Mile Trail
· Interpretive Signage
TBD
St. Louis, MO
NAVIGATE managed preconstruction and construction for Great Rivers Greenway on the Gateway Arch National Park Site Improvements, along with the Museum addition and renovation project. Scope of work included:
· Coordination with Project Partners: City of St.Louis (BPS), Bi-State Development, Gateway Arch National Park Foundation, National Park Service, Metropolitan St. Louis Sewer District
· Enhancements Near the Gateway Arch Museum Entranceto Maintain and Direct Pedestrian Access to the Entry, while also Reducing Visitor Foot Traffic Across Lawns in the Vicinity.
· Drainage Improvements, Corrections of Limestone Pavers, & Soil Improvements
· Installation of New Landscape and Planting Beds
TBD
Iowa City, IA
NAVIGATE is managing the pre-construction of Hickory Trail Senior Living, which contains both AssistedLiving and Memory Care facilities. Project scope is a three story, 134,300 sf building which includes:
TBD
Pacific, MO
NAVIGATE managed construction of this adaptive reuse project that will restore and revitalize the historic Red Cedar Inn, which is listed on the National Register ofHistoric Places. Built in 1934, this historic site resides along Route 66, a designated National Historic Trail. Project scope included:
· Revitalization as a Museum & Visitor Center for Historic Route 66
· New Building Addition to Support Children’s Museum with Public Restrooms
· Roof Replacement
· Interior Timber Structure Restoration
· Refinishing of Original Wood Floors
· Restoration of Original Historic Bar
· Coordinated Improvements with MoDOT
TBD
Houston, MO
NAVIGATE managed the preconstruction and construction of the $2.1M municipal pool for the City of Houston, which was funded by a combination of Missouri Department of Natural Resources Land Water Conservation Fund Grants along with a voter-approved sales tax increase. Project scope included:
· 225,000-Gallon Lap & Recreational Pool
· Bathrooms & Changing Rooms
· Concession Stand
· Community Rooms & Event Space
· Office Space for Lifeguards & Storage Room
· City’s Parks & Recreation Department
TBD
Jennings, MO
NAVIGATE is managing pre-construction & Construction for the City of Jennings new Community Center.
Project scope includes:
· New 15,000 SF Community Center
· Pre-engineered Metal Buildings – Gymnasium
· Community Multipurpose Rooms, Locker Rooms, & Fitness Center
· City Staff Offices
· Site Improvements including Parking Lot and Stormwater Management
· Sitework Preparation for Future City Hall Building
TBD
Kinloch, MO
NAVIGATE provided pre-construction services for the Kinloch Park RTP Grant Trail Project. NAVIGATE created a bid package, solicited bidders and assisted with selecting and onboarding a contractor. At the end of pre-construction, the Foundation also hired NAVIGATE to manage the construction phase.
TBD
Kirksville, MO
NAVIGATE is managing pre-construction and construction of several renovations and new additions that will upgrade multiple areas of campus. Project scope includes:
TBD
Kirkwood, MO
NAVIGATE is managing pre-construction and construction of the $11M renovation of Kirkwood’s Community Center.
Project scope includes:
· New Canopy & Lobby Entry Improvements
· Meeting Room Improvements
· Enhance Wayfinding
· New Finishes Include Flooring, Painting, Ceilings & Lighting
· Gymnasium Improvements
· Restroom Renovations
· HVAC & AV System Upgrades
· Electrical Infrastructure Upgrades
· Elevator Replacement
· Roof Replacements & Retrofits
· Ice Rink Lobby Improvements Including Fireplace & Rubber Flooring
TBD
City of Kirkwood, MO
NAVIGATE is managing pre-construction and construction of the historic Kirkwood Train Station. In 2021, the City of Kirkwood was awarded a Transportation Alternatives Program grant to restore the Station. Originally constructed in 1893 as a Missouri Pacific depot. It is listed on the National Register of Historic Places and contributes significantly to the Downtown Kirkwood National Historic District.
Project scope includes:
· Improve Building’s Functionality as a Train Station
· Allowing Future Flexibility as a Multi-Purpose Event Venue
· Preservation & Repair of Envelope & Interiors, including Replacement of Existing Roof with Slate
· Reconstruction of Original 1893 Passenger Canopy Extension
· Construction of New Storage Building
· Construction of New Larger ADA-Accessible Restrooms
· Collaboration with AMTRAK